facebook   twitter   mail  

The Nelson Photo News

 

38

Roving Camera

×

Within a month it is hoped to have the new gymnasium at Waimea College completed. Work on the building is now well advanced after a holdup for steel supplies in January. Dressing sheds for the present baths will then serve the two-fold purpose as rooms for the gym, the sheds having been built into the side of the gym. Over 100ft long, 56 ft wide and 28ft high, the gym will be large enough for a full-sized, basketball court.

×

Marlborough College batsman K. Patchett bowled by J. Whitehead, in the Nelson College v Marlborough match recently.

×

H. Horton (Nel) dropped at slips.

×

R. Rennie also survives a slips chance.