facebook   twitter   mail  

The Gisborne Photo News

 

3

Up She Goes..

×

The 72ft derrick which will be used to drive piles for the new Roebuck Road bridge was hoisted into position last Friday.
The derrick, which on account of its height constitutes a new but temporary landmark on the skyline of that part of the city, is built of steel. It was fabricated oh the old bridge, and hoisted up with winches.