facebook   twitter   mail  

The Nelson Photo News

 

45

Progress At The Port

×

An unusual view of buildings on the reclaimed area adjacent to McGlashen Quay. It was taken from one of the banks enclosing an area which will be reclaimed eventually.

×

The Talisman, converted to a floating landing stage, is now in use in the small boat harbour. A very useful amenity.

×

Work is progressing well on the formation of a light boat slip behind the premises of Dorman Engineering. When completed, this slip, provided with a winch, will be capable of handling boats of up to 80 tons. A much bigger slip is to be built later on an adjacent site.