3
Ripple Control
Part of the new ripple control system installed at the City Council's main substation in Haven Road. The equipment, with the relays, cost something like £30,000, but the control it can exercise (water-heating, street lighting, night rate metering, storage heating and many others) will mean a real saving to the Council in the long run. The operator is Claude Boyce.